Services at Bootle Junction (BOOTLEJ) on Monday 18/08/25
Report
6M77
p. 0437½
Liverpool Biomass Terminal
 
3S07
d. 0502
Wigan Locomotive Inspection Point
 
4D62
p. 0543
EAST MIDS GATEWAY TML GBRF
 
4G25
p. 0543
Hams Hall GB Railfreight
 
4L45
p. 0543
TILBURY CONTAINER SRVS GB
 
0F10
p. 0605
Liverpool Biomass Terminal
 
6M08
p. 0706
Liverpool Biomass Terminal
 
6E09
p. 0748
Drax AES GB Railfreight
 
0F27
p. 0934½
Liverpool Biomass Terminal
 
3S07
d. 0942
Wigan Locomotive Inspection Point
 
4M35
p. 0953
Seaforth Container Terminal (MDHC)
 
0F11
p. 1020½
Liverpool Biomass Terminal
 
4F35
p. 1118
Seaforth Container Terminal (MDHC)
 
6E10
p. 1120
Drax AES GB Railfreight
 
4F63
p. 1209
Seaforth C.T. (GBRF)
 
0F23
p. 1247
Liverpool Biomass Terminal
 
6F24
p. 1326
Liverpool Biomass Terminal
 
6M36
p. 1336
Liverpool Biomass Terminal
 
4S38
p. 1445
Mossend Euroterminal RfD Europe
 
4F57
p. 1452
Seaforth C.T. (GBRF)
 
Report
0F24
p. 1537
Liverpool Biomass Terminal
 
3S57
d. 1624
Kirkdale Carriage Sidings
 
3S90
d. 1624
Kirkdale Carriage Sidings
 
6E24
p. 1639
Drax AES GB Railfreight
 
6F27
p. 1641½
Liverpool Biomass Terminal
 
4F62
p. 1734
Seaforth C.T. (GBRF)
 
0F27
p. 1813
Liverpool Biomass Terminal
 
6M09
p. 1934
Liverpool Biomass Terminal
 
6E27
p. 1935
Drax AES GB Railfreight
 
0F34
p. 2107
Liverpool Biomass Terminal
 
4G63
p. 2115
Hams Hall GB Railfreight
 
4G63
p. 2115
Hams Hall GB Railfreight
 
6F73
p. 2134
LIVERPOOL EMR GBRF
 
6E34
p. 2219
Drax AES GB Railfreight
 
3S57
d. 2255
Wigan Locomotive Inspection Point
 
3S90
d. 2255
Wigan Locomotive Inspection Point
 
6M68
p. 2307
Liverpool Biomass Terminal
 
6F74
p. 2341½
LIVERPOOL EMR GBRF
 
6F72
p. 2341½
LIVERPOOL EMR GBRF
 
6V70
p. 0013
SWINDON EMR GBRF
 
Report
0F36
p. 0102
Liverpool Biomass Terminal
 
6E83
p. 0154
ATTERCLIFFE SDGS GBRF
 
6E36
p. 0213
Drax AES GB Railfreight
 
6M71
p. 0232
LIVERPOOL EMR GBRF
 
6M61
p. 0259
Liverpool European Metals (MDHC)
 
0F09
p. 0328
Liverpool Biomass Terminal
 
Key
Train moving.
Train has passed.
Deduced activation. ◊
Departure not reported. α
Time estimated. ε
Cancelled by VSTP. CV
Statistics
46 trains.
0 not on time.
0 cancelled.
0 buses.
0 activation deduced.
0 departure not reported.
Completed at 13/08/25 13:57:00 by liverail R4916q at sulzer. Elapsed time 34 ms.
Contains Information of Network Rail Infrastructure Limited licensed under the following licence: Click Here. This data is provided strictly for non-commercial, non-safety critical purposes; we cannot accept responsibility for any inaccurate or out of date information which may be contained herein. In addition, we can offer no guarantee regarding the uptime and/or accuracy of the pages, which are NOT part of any formal subscription service - they are provided simply as a way to thank those of you who have made a donation towards the running of the RailCam website.