Services at Gainsborough Lea Road (GBGHLRD GBL) on Monday 07/07/25
Report
5P62
p. 0618
Lincoln Central
0609 9E
4L03
p. 0631
Felixstowe South GB Railfreight
 
4L03
p. 0631
Felixstowe South GB Railfreight
 
2P01
d. 0641½
Lincoln Central
On time
2P62
d. 0705
Sheffield
On time
6L32
p. 0723
Whitemoor Local Distribution Centre
 
6X32
p. 0723
Whitemoor Local Distribution Centre
 
1L31
d. 0732
Lincoln Central
On time
1L40
d. 0744
Leeds
On time
4D08
p. 0753½
DONCASTER IPORT GBRF
 
4L98
p. 0805
LONDON GATEWAY GBRF
Cancelled
4L98
p. 0805
LONDON GATEWAY GBRF
0823 18L
4L28
p. 0820½
Felixstowe South GB Railfreight
 
4L28
p. 0820½
Felixstowe North GB Railfreight
0849 29L
1L33
d. 0833½
Lincoln Central
0836 3L
3J41
p. 0838½
Doncaster Up Decoy Yard
 
4L70
p. 0843
Felixstowe North Freighliner Terminal
 
1L44
d. 0846
Leeds
On time
0H75
p. 0854
Peterborough Virtual Quarry GB Railfreight
 
2K06
d. 0908½
Doncaster
0907 1E
6E57
d. 0918½
SCUNTHORPE ROXBY GULLET GB
 
6E57
d. 0920
Doncaster Down Decoy GB Railfreight
 
1L37
d. 0937½
Lincoln Central
On time
1L48
d. 0937
Leeds
On time
4L19
p. 0959½
Tilbury International Rail Freight Terminal GB Railfreight
 
2K07
d. 1012
Peterborough
1011 1E
4E53
p. 1017½
TINSLEY YARD GBRF
 
Report
4E00
p. 1017½
TINSLEY YARD GBRF
1016 1E
3J42
p. 1022
Peterborough
 
1L41
d. 1035
Lincoln Central
On time
1L52
d. 1039½
Leeds
On time
4L45
p. 1131
Felixstowe South English Welsh & Scottish Railway
 
4L45
p. 1131
Felixstowe North English Welsh & Scottish Railway
1142 11L
1L45
d. 1137½
Lincoln Central
1136 1E
1L56
d. 1143
Leeds
On time
0Z75
p. 1158
Neville Hill Traction & Rolling Stock Maintenance Depot
1148 10E
2K10
d. 1209½
Doncaster
1208 1E
0D74
p. 1224½
Doncaster Down Decoy GB Railfreight
 
6L61
p. 1228½
Chesterton Junction GB Railfreight
 
1L60
d. 1236
Leeds
On time
1L49
d. 1237
Lincoln Central
1236 1E
4L85
p. 1243½
Felixstowe North Freighliner Terminal
 
4L73
p. 1243½
LONDON GATEWAY PORT LINE 2
1242 1E
4L11
p. 1255
Felixstowe North GB Railfreight
1250 5E
4L15
p. 1255
Felixstowe North GB Railfreight
 
2K13
d. 1313
Peterborough
1315 2L
1L53
d. 1331½
Lincoln Central
1332 1L
6E85
p. 1341
BARNBY DUN ROCKWARE GLASS GBRF
1319 22E
6E86
p. 1341
MONK BRETTON REDFEARNS GBRF
 
4L87
p. 1341½
Felixstowe North Freighliner Terminal
 
1L64
d. 1349½
Leeds
On time
0H77
p. 1355
Peterborough Virtual Quarry GB Railfreight
 
6E30
p. 1403
Doncaster Up Decoy Yard
 
6X30
p. 1403
Doncaster Up Decoy Yard
 
Report
4L65
p. 1406½
Felixstowe North GB Railfreight
1347 19E
2K14
d. 1414½
Doncaster
1413 1E
6J34
p. 1420
Doncaster District Civil Engineer's Sidings
1418 2E
1L57
d. 1433½
Lincoln Central
On time
1L68
d. 1436
Leeds
On time
4L54
p. 1438½
Felixstowe North Freighliner Terminal
1439 1L
4L08
p. 1445½
LONDON GATEWAY GBRF
Cancelled
6D10
p. 1446½
GOOLE GLASSWORKS GBRF
 
2K17
d. 1520
Peterborough
1519 1E
1L61
d. 1533
Lincoln Central
On time
1L72
d. 1543
Leeds
On time
4L16
p. 1546½
Felixstowe South GB Railfreight
 
4E24
p. 1622
Leeds Freightliner Terminal
1604 18E
4E62
p. 1622
Doncaster Europort Freightliner
 
4E21
p. 1628½
TINSLEY YARD GBRF
1620 8E
1L65
d. 1631½
Lincoln Central
On time
1L76
d. 1638
Leeds
On time
4L14
p. 1644
Felixstowe South GB Railfreight
Cancelled
4L00
p. 1644
LONDON GATEWAY GBRF
 
6E88
p. 1651
GOOLE GLASSWORKS GBRF
Cancelled
4E25
p. 1707½
Heck Plasmor P S
 
4E25
p. 1707½
Heck Plasmor P S
1648 19E
4H00
p. 1713
Peterborough Virtual Quarry GB Railfreight
 
0D76
p. 1716
Doncaster Down Decoy GB Railfreight
 
1L69
d. 1734
Lincoln Central
On time
4E09
p. 1737
Leeds Freightliner Terminal
 
4L53
p. 1742½
Felixstowe North GB Railfreight
 
Report
4L00
p. 1742½
LONDON GATEWAY GBRF
1740 2E
1L80
d. 1745
Leeds
On time
4E61
p. 1752½
Leeds Freightliner Terminal
 
4E07
p. 1753½
Doncaster Europort Freightliner
1731 22E
2K22
d. 1803½
Doncaster
On time
4E39
p. 1820½
Normanton Wakefield Europort GB Railfreight
1808 12E
1L73
d. 1834
Lincoln Central
1833 1E
1L84
d. 1842
Leeds
On time
4L09
p. 1843½
Felixstowe North Freighliner Terminal
1810 33E
4L35
p. 1902
Felixstowe North English Welsh & Scottish Railway
 
2K25
d. 1912
Peterborough
1911 1E
4E20
p. 1927
MASBOROUGH N&W GBRF
CV
4E20
p. 1927
DONCASTER IPORT GBRF
1917 10E
1L77
d. 1939
Lincoln Central
On time
1L88
d. 1944
Leeds
On time
2K26
d. 1959
Doncaster
On time
4E56
p. 2021
Leeds Freightliner Terminal
Exp. 2019 2E
1L81
d. 2035
Lincoln Central
Exp. On time
2P88
d. 2040
Sheffield
Activated
4L79
p. 2045½
Felixstowe North Freighliner Terminal
 
4L78
p. 2045½
Felixstowe North Freighliner Terminal
 
6L55
p. 2052
Ripple Lane H Group Sidings
 
6V55
p. 2052
Acton Terminal Complex
CV
6V55
p. 2052
Acton Terminal Complex
1959 53E
4D43
p. 2113
DONCASTER IPORT GBRF
 
2K27
d. 2113½
Peterborough
Activated
4E43
p. 2113
DONCASTER IPORT GBRF
Cancelled
Report
4E43
p. 2113
DONCASTER IPORT GBRF
Exp. 2103 10E
6E02
p. 2123½
BARNETBY DOWN RECP GBRF
 
5B90
p. 2139
DONCASTER CARR IEP DEPOT
 
6H11
p. 2139
Peterborough Virtual Quarry GB Railfreight
 
2P37
d. 2148
Lincoln Central
Activated
2P90
d. 2149
Sheffield
 
6H97
p. 2157
Peterborough West Yard
 
6L63
p. 2232½
MARCH UP YARD GBRF
Exp. 2147½ 45E
6L64
p. 2232½
MARCH UP YARD GBRF
 
4M52
p. 2239
Willesden Euroterminal
Activated
4E64
p. 2247½
Doncaster Europort Freightliner
 
4L10
p. 2256½
Felixstowe North English Welsh & Scottish Railway
 
2P92
d. 2305
Sheffield
 
4L07
p. 2326
LONDON GATEWAY PORT LINE 2
Activated
6D10
p. 2339
BARNETBY DOWN RECP GBRF
CV
4E59
p. 0012½
South Bank Tees Dock Corus Freightliner Terminal
Cancelled
6V85
p. 0014½
Acton Terminal Complex
 
4L88
p. 0056½
LONDON GATEWAY PORT LINE 2
 
4L39
p. 0103½
TILBURY CONTAINER SRVS GB
Activated
4L20
p. 0203
Felixstowe South GB Railfreight
Activated
4L20
p. 0203½
Felixstowe South GB Railfreight
 
4E28
p. 0303
DONCASTER IPORT GBRF
Activated
4E29
p. 0303
DONCASTER IPORT GBRF
 
4E52
p. 0310
HARTLEPOOL PD PORTS FL
Activated
4L40
p. 0321½
Felixstowe North Freighliner Terminal
 
4E45
p. 0342½
Normanton Wakefield Europort
 
4E46
p. 0342½
Normanton Wakefield Europort
Activated
Key
Train moving.
Train has passed.
Deduced activation. ◊
Departure not reported. α
Time estimated. ε
Cancelled by VSTP. CV
Statistics
135 trains.
4 not on time.
9 cancelled.
0 buses.
0 activation deduced.
0 departure not reported.
Completed at 07/07/25 20:07:02 by liverail R4916q at sulzer. Elapsed time 425 ms.
Contains Information of Network Rail Infrastructure Limited licensed under the following licence: Click Here. This data is provided strictly for non-commercial, non-safety critical purposes; we cannot accept responsibility for any inaccurate or out of date information which may be contained herein. In addition, we can offer no guarantee regarding the uptime and/or accuracy of the pages, which are NOT part of any formal subscription service - they are provided simply as a way to thank those of you who have made a donation towards the running of the RailCam website.