banner800

Working...

Train 6825887 (G36820) 2B03 08:55 Buxton to Manchester Piccadilly

                Update ID: 685  15/01/25 20:24:00
                  Created: 15/01/25 20:24:00
                  Deleted: 
     Bank holiday running:  
            STP Indicator: P Permanent
                Train UID: G36820
                ATOC code: NT [NT]
                 UIC code: 
                Days runs: Su 
           Schedule Dates: 18/05/25 - 14/09/25
            Signalling ID: 2B03
         Deduced headcode: 
           Train category: OO Ordinary Passenger
             TOC Headcode: 8862
       Train service code: 12228820
          Business Sector: 
               Power type: DMU Diesel Mechanical Multiple Unit
              Timing Load: S Class 150, 153, 155, or 156
                    Speed: 075 mph
Operating Characteristics:  
         Usual Allocation: 
            Seating Class: S Standard only.
                 Sleepers:  
             Reservations: S Possible.
     Connection Indicator: 
            Catering Code: 
         Service Branding: 
             Train Status: P Passenger

                          Location   Arr     Dep    P PathLine
                            Buxton          08:55   2         Train begins.
            Buxton No 1 Signal Box          08/56             
                        Dove Holes  09:00H  09:01             Take up and set down passengers.
                Chapel-En-Le-Frith  09:06   09:06H  2         Take up and set down passengers.
                     Whaley Bridge  09:12   09:13   2         Take up and set down passengers.
                      Furness Vale  09:16   09:16H            Take up and set down passengers.
                 New Mills Newtown  09:19   09:19H  2         Take up and set down passengers.
                            Disley  09:22H  09:23H  2         Take up and set down passengers.
                        Middlewood  09:26H  09:27   2         [1]Take up and set down passengers.
                       Hazel Grove  09:31   09:32   2         Take up and set down passengers.
                         Woodsmoor  09:34H  09:35   2         Take up and set down passengers.
                         Davenport  09:36H  09:37H  2         (1)Take up and set down passengers.
   Stockport Edgeley Junction No 1          09/40H         FL 
   Stockport Edgeley Junction No 2          09/41             
                         Stockport  09:42   09:45   3         Take up and set down passengers.
            Heaton Norris Junction          09/46H            
               Slade Lane Junction          09/49             (1)
                  Ardwick Junction          09/51H            
             Manchester Piccadilly  09:55          11  FL     Train finishes.

[] Engineering allowance.     () Pathing allowance.    {} Performance allowance.

Completed at 12/06/25 11:31:02 by liverail R4916q at sulzer. Elapsed time 50 ms.

Contains Information of Network Rail Infrastructure Limited licensed under the following licence: Click Here.
This data is provided strictly for non-commercial, non-safety critical purposes; we cannot accept responsibility for any inaccurate or out of date information which may be contained herein. In addition, we can offer no guarantee regarding the uptime and/or accuracy of the pages, which are NOT part of any formal subscription service - they are provided simply as a way to thank those of you who have made a donation towards the running of the RailCam website.